Large-area BIPV curved solar tile roof array for commercial buildings by GreenMore
Home

solar tile roof mounting

solar tile roof mounting

  • How to Install Solar Tiles on a Roof: Step by Step
    How to Install Solar Tiles on a Roof: Step by Step Apr 13, 2026
    Installing a solar tile roof is roofing work with electrical consequences, not electrical work on a roof. The tiles are the weatherproof covering first and a generator second, so the sequence that matters is the roofer's: set out the courses, fix the battens, lay from the eave up, and close the details at verges, ridges and penetrations. The wiring follows the courses rather than the other way round. This guide covers that sequence from the first line on the deck to the tests before handover. It does not repeat what the roof build-up has to contain — layers, ventilation and load path are in integrated roofing design — nor how strings and inverters are sized, which is in how solar roofing tiles integrate with BIPV systems. Here it is the site work. The layers under the tiles: underlay, battens, and the air path behind the covering. What Gets Decided Before Anyone Goes on the Roof Load, and what the existing roof can take Our three-curve tiles weigh 6.5 kg each and about 21.5 kg per square metre once laid, which is in the same range as a clay or concrete tile covering. On a new build that is a design input. On a retrofit it is a question for a structural engineer, because the answer depends on the trusses, the purlin spacing and the state of the battens rather than on the tile. A roof that has been leaking for years will not be fixed by covering it. Roof planes decide the string layout Every plane with a different orientation or a different amount of shade should be its own string, because one shaded plane in a series string drags the rest down. That decision is made on paper, before the first course is laid, and it has a physical consequence: the tile count per plane has to reach the inverter's start-up voltage, and where a plane is too short the answer is a different inverter rather than a longer string. Check the delivery before it goes up Open a carton from each pallet and check colour against the approved sample, glass for chips at the corners, and the junction box for a seated connector. Tiles from different production batches can differ slightly in tone, and a roof laid from two batches shows the join in daylight. Which build to order in the first place is covered in our comparison of three-curve solar tile types. Once the tiles are on the roof, a colour mismatch is a full re-lay; at ground level it is a phone call. Setting Out: Lines, Battens and the Eave Course The eave course sets the whole roof The first course is laid level and true, because every course above it inherits its error. Set a line along the eave, establish the gauge for the course spacing, and dry-lay three or four tiles to confirm the gauge before fixing anything. A course that runs out by 10 mm at one end will be 10 mm out at the ridge, and the ridge closure is where it shows. Battens, fixed the way the roof was designed These tiles are laid like ordinary roof tiles, on battens or rails that form part of the roof build-up. There is no separate mounting frame above the covering, which is the point of the product: the tile is the covering. Batten spacing follows the tile gauge and the fixing pattern follows the structural design, so the two documents to have on site are the roof drawing and the structural calculation, not a generic installation sheet. Lap and sequence Courses overlap 85 mm top to bottom, with a 25.34 mm edge safety zone at the lap. The sequence is left to right and bottom to top, and the side lap is adjustable, which is how the system absorbs accumulated error across a long run. Where a run needs to be pulled in, adjust the side laps across several courses rather than compressing one. Laying the Field of Tiles Connect as you go, not afterwards The tiles have factory-fitted leads with MC4 connectors and a junction box rated IP67, so the electrical work happens course by course while the tile is still in the roofer's hand. Cables are clicked together and tucked into the channel under the tile before the next course covers them. Pulling a roof apart later to find a missed connector costs more than the ten seconds it takes to check the click. Keep the cable out of the water path Leads run up the slope under the tiles, never down across a lap, and they are dressed so that no cable sits in the channel where water runs. Where a string turns at a verge or a ridge, leave a service loop long enough to lift a tile for a future repair, and secure the cable so it cannot chafe against the batten. Finish one plane before starting the next Working plane by plane keeps strings tidy and makes polarity checks meaningful. It also keeps the roof watertight at the end of each day, which matters more than the schedule: a half-laid plane with the underlay exposed is a roof that will take water if it rains overnight. A course going down: the connectors click together before the next tile covers them. Verges, Ridges and Penetrations Water gets into tiled roofs at the edges and the holes, not in the middle of the field. On a solar tile roof the same is true, and the details are ordinary roofing details with an electrical cable added. Verges and eaves The verge closure has to hold the edge course against wind uplift and cover the cut edge of the tiles. At the eave, the underlay runs into the gutter and the first course overhangs enough to drip clear of the fascia without exposing the fixing line. Both details are checked before the field is laid, because fixing them afterwards means lifting courses. Ridge and hip Ridge and hip tiles close the top of the field and, on a ventilated roof, carry the outlet for the air path under the tiles. Where the design includes ventilation, the ridge is a component rather than a cap, and closing it with a solid mortar bed defeats the build-up underneath. Penetrations and cable entries Aerial masts, soil pipes and the DC drop to the inverter all break the covering. Each needs a flashed, upstand detail that sheds water above the lap line, with the cable entering through a gland rather than a drilled hole. Route the DC drop through a single penetration where possible, and never through a lap that another course covers. Electrical Work That Belongs to the Roofing Phase String boundaries and polarity Mark where each string ends while the tiles are going down, and check polarity at the end of each string before it disappears under the next plane. A reversed tile in a series string does not fail loudly; it quietly costs the output of the tiles behind it, and finding it later means measuring every tile in the string. Earthing and equipotential bonding The array frame, the mounting structure and any metallic roof component are bonded to a common earth, with the conductor sized to the local code and protected against corrosion at every joint. On a roof this is a small amount of work done once, and a large amount of work done later. Isolation and rapid shutdown Provide a visible DC isolator at the inverter and, where the code requires it, rapid shutdown at string level so that a firefighter working on the roof is not exposed to live DC. Both are specified at design stage and installed during the electrical phase; neither can be retrofitted cheaply once the covering is closed. Testing and Handover The three tests that catch most faults Insulation resistance on each string, measured before the inverter is connected, with the value recorded rather than just passed. Open-circuit voltage per string, compared with the calculated figure for the day's module temperature. A string reading low usually has an unseated connector; a string reading zero has a break. Earth continuity from the furthest tile frame back to the earth bar, which is the check most often skipped and the one an inspector will ask for. Commissioning and grid connection Configure the inverter, confirm that each MPPT is tracking separately, and check that the monitoring platform is reporting the same figures the inverter display shows. Grid connection follows the local application, and the paperwork is easier if the single-line diagram and the string layout were drawn before the install rather than reconstructed afterwards. What the owner should receive A string layout drawing, the test results, the serial numbers of inverter and battery, the warranty terms for each component, and a one-page note on what the monitoring should look like on a clear day. Without that baseline, a slow decline is invisible until a bill changes. Item Value for our three-curve tiles Why it matters on site Tile size 720 × 500 mm, 32 mm thick on the back-contact series Sets the course gauge and the number of tiles per plane Weight 6.5 kg per tile, about 21.5 kg per square metre laid Structural check on retrofit; two people can carry a course Head lap 85 mm, with a 25.34 mm edge safety zone Under-lapping is the most common cause of leaks at the lap Lay direction Left to right, bottom to top, side lap adjustable Spreads accumulated error instead of compressing it into one course Connector MC4, junction box IP67, factory-fitted leads Connect per tile, check the click, dress the cable uphill System limits 1000 V DC maximum system voltage, 5400 Pa front load, Class A fire Sets the string ceiling and the load the roof must carry Five Things That Go Wrong on Site Under-lapping at the head of a course to gain height at the ridge. The lap is 85 mm for a reason, and the ridge closure is adjustable. Cables dressed downhill across a lap, so water follows the cable into the underlay. String boundaries decided after the tiles are down, which forces either a longer string than the inverter allows or a service visit to rewire. Colour batches mixed between planes, visible only once the sun is low. No recorded insulation resistance at commissioning, which makes every later fault a guessing game. Frequently Asked Questions How long does a tile roof take to install? A typical house roof takes three to five working days for the covering and the wiring, with the inverter and battery adding half a day. Roof complexity is the variable: hips, valleys, dormers and multiple planes take longer than a plain gable, and scaffolding and weather can add days that no schedule survives. Does the old roof have to be removed first? Yes. These tiles replace the covering rather than sit over it, so the existing tiles come off, the deck and battens are inspected, and the underlay is renewed where it has reached the end of its life. A roof that is stripped to the deck is also the only point at which a structural upgrade is cheap. Can tiles be installed in rain or cold weather? The tiles can be handled in cold weather, but the roof should not be left open and the electrical connections should not be made in rain. Below the point where sealants and flashing adhesives stop curing, the detail work has to wait even if the tiles can be laid. Plan the penetrations and flashings for a dry window. How is a single damaged tile replaced? Tiles are individually replaceable. The two courses above the damaged tile are lifted far enough to release the side and head laps, the connectors are unplugged, the tile is swapped and the courses are re-laid with the lap restored. It is a short job for someone who knows the system and a frustrating one for someone who does not, which is why the string layout drawing belongs in the handover pack. What tests are done before handover? Insulation resistance per string, open-circuit voltage per string against the calculated value, earth continuity, and a functional check that each MPPT tracks and the inverter exports. Where a battery is fitted — paired as described in how solar roof tiles pair with home energy storage — add a backup test with the grid disconnected and a check that the battery reaches its configured charge current. Does the roof structure need reinforcing? Usually not, because the covering is in the same weight class as the tiles it replaces. Reinforcement becomes an issue on older roofs with undersized battens, on long spans, or where snow load is high and the original roof was built for a lighter covering. That is a calculation, not a judgement call on site. Work With GreenMore GreenMore is a photovoltaic tile manufacturer. Our three-curve tiles, photovoltaic bricks and photovoltaic curtain walls are produced in-house, in CIGS thin-film and back-contact technologies. Inverters, batteries and other non-tile components are supplied as supporting parts of the complete system. If you are planning an installation, send the roof drawings, the plane orientations, the tile count you expect per plane and the local wind and snow loads. We will come back with a laying plan, the string layout and the accessory list, so the site work starts from a drawing rather than a conversation. L Luke Product Manager, BIPV Solar Tiles Luke manages GreenMore's photovoltaic building-material range, from the CIGS thin-film three-curve tile to the back-contact line. In the solar industry since 2017, he focuses on designs that are genuinely buildable, with specs and warranty terms that match the products actually shipped. Updated on November 14, 2026

Subscribe To Our Newsletter

Stay up to date with GreenMore. We share new BIPV solar tile releases, product and certification updates, and field notes from our projects — no fluff, just the things that matter to installers, distributors, and system integrators. If there's something you'd like to see covered, drop us a line — we read every reply.

Copyright @ 2026 GreenMore All Rights Reserved. Network Supported

Sitemap / Blog / Xml / Privacy Policy

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

Products

WhatsApp

contact