Eighteen residential roofs across Greece now carry our tiles. They are spread across Athens, Thessaloniki, Patras and a handful of smaller towns, and they average about 20 kW each, which makes them large houses rather than apartments. Both tile lines appear in the mix, the CIGS three-curve and the newer back-contact, and not every battery on those roofs came from us.

That last point matters more than it sounds. This is a write-up of what eighteen roofs actually required, including the parts that did not go the way a brochure implies.

The Eighteen Roofs at a Glance

Item Detail
Roofs completed 18 residential roofs
Location Athens, Thessaloniki, Patras and smaller towns
Average capacity About 20 kW per home
Tile types used CIGS three-curve and back-contact three-curve, mixed by roof
Storage Every roof has a battery; some are ours, some were sourced locally by the dealer
Installation Local installation partners, supervised to our method statement
Warranty 25-year power; 10-year product on BC and triple-arch

Twenty Kilowatts Is a Bigger Roof Than Most Buyers Expect

The first thing to settle with any client who asks for 20 kW in tiles is how much roof that means. It is a lot. Our CIGS three-curve tile delivers between 77 and 105 W per square metre of finished roof depending on colour, so 20 kW lands somewhere around 200 m². The back-contact tile reaches about 170 W per square metre at 50 W per piece, so the same 20 kW fits into roughly 120 m².

In tile counts, that is about 700 CIGS tiles against about 400 back-contact tiles, because the tiles share the same 720 × 500 mm footprint and are laid at 3.4 pieces per square metre.

For a 20 kW roof CIGS three-curve Back-contact three-curve
Power per tile 25 to 32 W 37 to 50 W
Power per roof area 77 to 105 W/m² About 170 W/m²
Tiles needed About 700 About 400
Roof area needed About 200 m² About 120 m²
Weight added About 21.5 kg/m² About 22 kg/m²

That 80 m² gap is the single most common reason a Greek roof ends up in back-contact. On a villa with a large, clean south-facing plane, the smaller array is cheaper to build, needs fewer tiles, and the owner keeps more of the garden. On a roof that steps, curves or wraps around a staircase, the CIGS tile is the only one that follows the shape, and the extra area is simply the cost of getting the architecture right.

Finished residential solar tile roof on a Greek villa, tiles laid in courses with the ridge line capped and the array following the original roof plane.

A completed roof near Athens. The tiles replace the covering rather than sitting on top of it.

Choosing Between the Two Tile Lines

Across the eighteen roofs, the split came down to four questions, and none of them were about cell efficiency:

  • Is the roof plane flat and unbroken? Then back-contact, because output per square metre decides the array size and the price per kW.
  • Does the roof have a compound curve, a turret, or a change of pitch that a rigid laminate cannot follow? Then CIGS.
  • Is the structure old timber with limited spare capacity? CIGS again, at 6.6 kg per tile against 6.5 for back-contact, but with fewer pieces per kW and a thinner laminate.
  • Does the client care about a specific colour running evenly across the whole plane? CIGS, where the colour comes from the film rather than a surface finish.

The technical reason TOPCon never appears on these roofs is set out separately in why TOPCon stays on the flat format. The product-level comparison of the two tile lines is in the three-curve tile range.

The Battery Was Not Always Ours

Every one of the eighteen roofs has a battery. Not every battery came from us, and that is worth stating plainly rather than glossing over.

Some of the Greek dealers we work with already have supply relationships for hybrid inverters and batteries, GoodWe and Solis among the brands they carry, and they buy locally because the lead time is shorter, the warranty is handled in-country, and their installation teams already know the commissioning app. On those roofs we supplied the tiles and the mounting system, and the dealer supplied the electrical package.

This works because the tile is a DC generator and nothing more. It does not care which inverter it feeds, as long as three conditions are met: the string voltage stays inside the inverter window, the system voltage does not exceed 1,000 V DC, and the per-tile leads and IP67 connectors are mated with the right fuse rating, 30 A in our case. What does matter is string design. Tiles produce at low voltage per piece, so a roof of 400 or 700 tiles needs more MPPTs and shorter strings than a panel array of the same size, and a dealer who has only ever wired panels will underestimate that.

On the roofs where the battery is ours, the package is the stacked LFP unit, 5.12 kWh per module and up to 20.48 kWh in a single stack, paralleled to 50 kWh where the house needs it. The chemistry is the same LFP in both cases, so the difference is service and paperwork, not performance.

Where we do push back is on mixed responsibility. If a fault appears on a roof with our tiles and someone else's inverter, the first two visits are spent proving whose side it is on. We ask for a commissioning record at handover that lists string voltages and insulation resistance per string, because that document ends most of those arguments in ten minutes.

What 20 kW Actually Delivers in August

A number worth putting in front of any client before they sign: 20 kW on the datasheet is not 20 kW at two in the afternoon in Attica.

The power temperature coefficient on our tile line is −0.260% per °C. A tile roof in a Greek summer runs hot, and a cell temperature of 65 °C against the 25 °C reference is an ordinary afternoon, not an extreme. That is a 40 °C rise, which costs about 10.4% of output. A 20 kW array therefore sits near 17.9 kW at the hottest part of the day, and it is the morning and evening hours that carry the annual yield.

This is also the argument for the battery. Storage does not fix a derated afternoon; it moves the harvest to the evening, when the house is actually drawing. On a Greek tariff with a meaningful spread between midday production and evening consumption, that shift is worth more than another kilowatt of nameplate.

Where the Roof Work Decides the Outcome

Almost every problem we have had to solve on these roofs started in the carpentry, not the electrics.

The tiles need a true plane. Battens set out to our spacing, checked for level along the eave before the first course goes down, save a day of adjustment later. The 85 mm head lap has to be held consistently, because a course that creeps up by ten millimetres over eight metres shows as a wave from the street. Ridge and verge cappings are the parts that leak when they are rushed, and they are the last thing anyone wants to revisit on a finished villa.

The full sequence, including the flashing details and the order in which the courses close, is in how to install solar tiles on a roof. Our Greek partners had all fitted clay and concrete tiles before; the part they had to learn was the hook fixing and the cable route under the tile, not the tiling itself.

Crating, Shipping and Arrival Checks

Eighteen roofs is enough volume that logistics stopped being an afterthought. Tiles ship in timber crates with foam separators between courses, palletised and braced for a container, and each crate is labelled by roof zone so the installers are not sorting 700 pieces on the ground.

The arrival check matters as much as the packing. Count the crates against the packing list, inspect the glass on the top and bottom courses of every crate, and photograph any damage before the pallet is broken. A tile that cracked in transit and got installed anyway will be blamed on the product eighteen months later, and by then the photographs are the only evidence that exists.

Timber crates of solar tiles palletised and braced inside a shipping container, each crate labelled by roof zone for the Greek projects.

Crates are labelled by roof zone, so the installers are not sorting the whole order on site.

What We Do Not Have Numbers For

We do not have generation figures or self-consumption ratios for these eighteen roofs, and we are not going to estimate them.

The production data sits in the inverter monitoring account, which belongs to the homeowner and the installing dealer. As the tile manufacturer we see the shipment, the commissioning record and the occasional service ticket. Publishing a yield figure we have not measured would be easy and would also be the first thing a careful buyer checks.

What we can give a client instead is the part we do control: flash-test data per batch, IEC 61215 and IEC 61730 certificates, the 5400 Pa front-load test, and the material warranty behind the 25-year power figure. If a dealer has monitored yield on a comparable roof, that number is worth more than anything we could put in a brochure, and it is theirs to share.

What the Next Greek Project Looks Like

The pattern across these eighteen roofs is now predictable enough to plan around. Dealers who started with one house are ordering for two or three at a time, because the freight cost per tile falls sharply once a container is full and the installation crew has already learned the system. Roofs above 15 kW are going back-contact unless the geometry forces CIGS. Storage is no longer a separate conversation; it is quoted with the roof.

For a dealer considering the Greek market, the practical advice is to start with a single roof, use it to train the crew on the hook fixing and the string design, and keep the first order small enough that a mistake is a lesson rather than a loss. The same approach worked on our 407-tile roof in Netanya, which was a single building before it became a reference.

The tile range is on the site as the 32 W triple-arch hantile and the back-contact curved tile. If storage is part of the package, the stacked LFP battery covers 5 to 50 kWh.

Frequently Asked Questions

How many roofs have you completed in Greece?

Eighteen residential roofs so far, spread across Athens, Thessaloniki, Patras and several smaller towns, averaging about 20 kW each. Both tile lines are represented in that number.

Can I use my own inverter and battery with your tiles?

Yes, and on some of these Greek roofs that is exactly what happened. The tile is a DC generator, so any inverter with a compatible string voltage window works, provided the system stays at or below 1,000 V DC and the fuse rating matches our 30 A per-tile leads. What needs care is string design, because tiles run at lower voltage per piece than panels.

What roof area does a 20 kW installation need?

About 200 m² with the CIGS three-curve tile and about 120 m² with the back-contact tile, which is the difference between roughly 700 and roughly 400 pieces. That gap is usually what decides which line a large villa uses.

How much does output drop in a Greek summer?

Expect around 10% at the hottest part of the day. The power temperature coefficient is −0.260% per °C, and a cell temperature of 65 °C against the 25 °C reference is normal on a tile roof in August, so a 20 kW array sits near 17.9 kW at that moment.

Do you have generation or self-consumption data for these projects?

No. That data sits with the homeowner's monitoring account and the installing dealer, and we will not publish an estimate as though it were a measurement. Ask the dealer who installed a comparable roof; a monitored figure from a nearby site is worth more than anything we can claim.

What warranty applies to the tiles?

Twenty-five years on power output across the range. The back-contact and triple-arch tiles also carry a ten-year product warranty on materials and workmanship; the CIGS tile is covered by the power term alone. The battery and inverter packages we supply carry a three-year term. If a dealer supplies the electrical package locally, that warranty comes from their brand, not from us, and the handover documents should make that clear to the homeowner.

L

Luke

Product Manager, BIPV Solar Tiles

Works across the CIGS and back-contact tile lines, and spends most of his time on the roofs where the drawing and the building disagree.

Updated on November 16, 2026

Subscribe To Our Newsletter

Stay up to date with GreenMore. We share new BIPV solar tile releases, product and certification updates, and field notes from our projects — no fluff, just the things that matter to installers, distributors, and system integrators. If there's something you'd like to see covered, drop us a line — we read every reply.

Copyright @ 2026 GreenMore All Rights Reserved. Network Supported

Sitemap / Blog / Xml / Privacy Policy

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

Products

WhatsApp

contact